Global Project Portfolio

Manufacturing

186 kWh

Lowers industrial demand charges with intelligent peak shifting, utilizing advanced DC coupling for superior energy efficiency.

Kanagawa, Japan

2026

ProeM

Water Purification

125 kW / 262 kWh

Reduces daily operational costs with smart peak shifting, while providing resilience against grid stress during northern Vietnam’s low-hydropower periods.

Hanoi, Vietnam

2025

Max-Pro

Municipal Building

125 kW / 262 kWh

Seamless PV & ESS integration, DC coupling with optimal power conversion efficiency.

Quang Ninh, Vietnam

2026

Max-Solaris

Manufacturing

125 kWh & 262 kWh

Skips costly equipment upgrades (like transformers) and slow grid approvals, providing instant, extra power for the factory without the hassle.

Hanoi, Vietnam

2025

MU

Wood Processing

500 kW / 745 kWh

PV + ESS + Diesel Generator ; solar self consumption increased to 90%

Baden-Württemberg, Germany

2025

ProeM

Food Processing

2.5 MW / 5.24 MWh

Uses stored energy to lower electricity demand, significantly reducing the monthly bills for high-energy factory machines.

Belgium

2025

Max-Pro

Utilities

2 MW / 6.7 MWh

High-precision liquid cooling and integrated safety protocols ensure consistent performance and operational security in demanding utility-scale environments.

Kagoshima, Japan

2026

ProeM

Ostrich Husbandry

3000 KW / 3727 KWh

Engineered to withstand extreme South African heat and humidity via advanced thermal management; includes Black Start capability to safeguard delicate breeding cycles from frequent national load shedding.

South Africa

2024

ProeM

Wastewater Management

500 kW / 978 kWh

Mitigates volatile electricity prices through dual-cycle peak shaving; features an integrated modular design for rapid grid-connection and a diesel interface to ensure 24/7 continuous municipal operations.

Netherlands

2025

ProeM

邮箱

Contact Us

Contact our Energy Storage (ESS) experts now to get your customized solution!

Message Us