Huaibei Construction Investment ESS TWS Technology Case

淮北 (中国) | 建设投资办公楼

挑战

As part of a flagship urban development project, the client needed to demonstrate the feasibility of building-integrated decarbonization by optimizing rooftop and parking spaces for renewable energy.

解决方案

We implemented a localized microgrid consisting of 118 kW Rooftop PV paired with 2 sets of MU Series (Commercial & Industrial) Liquid-Cooling Cabinets (430 kWh total). The MU Series utilizes Remote Intelligent Monitoring to store excess solar power during weekends and release it during weekday peaks, ensuring maximum self-consumption.

主要成果

The project serves as a regional benchmark for high-quality urban development, reducing annual carbon emissions by 135 tons—the ecological equivalent of planting 7,516 trees.

邮箱

联系我们

立即联系我们的储能(ESS)专家,获取您的定制化解决方案!