{"id":8798,"date":"2026-11-19T03:26:14","date_gmt":"2026-11-19T03:26:14","guid":{"rendered":"https:\/\/tws-bess.com\/?p=8798"},"modified":"2026-11-24T06:10:24","modified_gmt":"2026-11-24T06:10:24","slug":"la-tecnologia-tws-a-re-2026-promuove-la-resilienza-energetica-nei-settori-industriali-commerciali-degli-stati-uniti","status":"publish","type":"post","link":"https:\/\/tws-bess.com\/it\/tws-technology-at-re-2026-driving-energy-resilience-across-u-s-commercial-industrial-sectors\/","title":{"rendered":"TWS Technology al RE+ 2026: promuovere la resilienza energetica nei settori commerciale e industriale degli Stati Uniti"},"content":{"rendered":"<p><a href=\"https:\/\/www.linkedin.com\/company\/tws-technology-ess\/\" target=\"_blank\" rel=\"noopener\"><\/a><a href=\"https:\/\/www.linkedin.com\/company\/tws-technology-ess\/\" target=\"_blank\" rel=\"noopener\"><\/a><strong>Tecnologia TWS<\/strong> (TWS ESS) successfully concluded its exhibition at <strong>RE+ 2026<\/strong> in Las Vegas on November 19, local time. Engaging directly with leading U.S. project developers, EPCs, and distributors, our team showcased how our advanced Energy Storage Systems (ESS) solve the power continuity and cost challenges in the North American grid.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/3s-1024x768.jpg\" alt=\"3s\" class=\"wp-image-8799\" srcset=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/3s-1024x768.jpg 1024w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/3s-300x225.jpg 300w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/3s-768x576.jpg 768w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/3s-16x12.jpg 16w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/3s.jpg 1440w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ember77\">Navigating U.S. Policy Shifts and Supply Chain Scrutiny<\/h2>\n\n\n\n<p id=\"ember78\">The U.S. energy storage market is undergoing rapid regulatory changes. Recently, the FCC has increased scrutiny over the origins of inverters and power conversion systems (PCS). For many developers, this creates severe supply chain bottlenecks and project delays.<\/p>\n\n\n\n<p id=\"ember79\">At TWS ESS, we proactively eliminate this friction. By integrating <strong>FCC-accepted components<\/strong>, we ensure our clients experience zero regulatory hassle. Your project timelines remain strictly intact, insulated from geopolitical supply chain disruptions.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/05\/Max-Solaris-1024x575.jpg\" alt=\"Max Solaris\" class=\"wp-image-7813\" srcset=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/05\/Max-Solaris-1024x575.jpg 1024w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/05\/Max-Solaris-300x169.jpg 300w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/05\/Max-Solaris-768x432.jpg 768w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/05\/Max-Solaris-1536x863.jpg 1536w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/05\/Max-Solaris.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Max-Solaris with FCC-accepted Hybrid Inverters<\/figcaption><\/figure>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ember81\">Why Safety Certifications Dictate Project Success<\/h2>\n\n\n\n<p id=\"ember82\">Beyond supply chain integrity, the North American market demands absolute physical safety. Securing site permitting and insurance approvals requires top-tier compliance. This is where TWS Technology separates itself from the competition.<\/p>\n\n\n\n<p id=\"ember83\">A major highlight of our RE+ presence was the official <strong>UL 9540 Certification Awarding Ceremony<\/strong> for our flagship <strong>BESS Containers<\/strong>, presented by <strong>Intertek<\/strong>.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/2s-1024x768.jpg\" alt=\"I rappresentanti di TWS Technology ricevono ufficialmente la certificazione UL 9540 alla cerimonia di premiazione RE+\" class=\"wp-image-8781\" srcset=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/2s-1024x768.jpg 1024w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/2s-300x225.jpg 300w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/2s-768x576.jpg 768w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/2s-16x12.jpg 16w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/2s.jpg 1440w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p id=\"ember85\">For our EPC partners, these credentials are not just badges; they are bankable guarantees of safety and rapid deployment. We are proud to announce that our company <strong>possesses and complies with the following core U.S. safety standards<\/strong>:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>Certification \/ Standard<\/strong><\/td><td><strong>What It Is<\/strong><\/td><td><strong>Why It Matters to EPCs &amp; Developers<\/strong><\/td><\/tr><\/thead><tbody><tr><td><strong>UL 1973<\/strong><\/td><td>Safety standard for batteries in stationary applications<\/td><td>Ensures the core battery cells and modules are fundamentally safe against electrical and environmental abuse.<\/td><\/tr><tr><td><strong>UL 9540A<\/strong><\/td><td>Test method for evaluating thermal runaway fire propagation<\/td><td>Crucial for AHJs (Authorities Having Jurisdiction) to approve site layouts. Proves fire won&#8217;t spread.<\/td><\/tr><tr><td><strong>UL 9540<\/strong><\/td><td>Safety standard for the complete Energy Storage System<\/td><td>Guarantees the entire integrated system (e.g., battery, controls) operates safely together.<\/td><\/tr><tr><td><strong>NFPA 855<\/strong><\/td><td>Standard for the installation of stationary ESS<\/td><td>Dictates spacing, fire suppression, and deployment rules. Vital for local fire marshal sign-off.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ember95\">Proven Track Record in the U.S. C&amp;I Sector<\/h2>\n\n\n\n<p id=\"ember96\">Our engineering confidence is backed by a proven track record. TWS Technology has successfully delivered mission-critical commercial and industrial (C&amp;I) projects across the United States.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ember97\">3.75 MW \/ 7.45 MWh System<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Application:<\/strong> Precision Manufacturing<\/li>\n\n\n\n<li><strong>Use Case: <\/strong>Backup power to prevent shutdown losses and ensure production assurance.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/US-California-3.75-MW-7.45-MWh-1024x768.jpg\" alt=\"TWS ESS US California 3.75 MW 7.45 MWh Project\" class=\"wp-image-8800\" srcset=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/US-California-3.75-MW-7.45-MWh-1024x768.jpg 1024w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/US-California-3.75-MW-7.45-MWh-300x225.jpg 300w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/US-California-3.75-MW-7.45-MWh-768x576.jpg 768w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/US-California-3.75-MW-7.45-MWh-1536x1152.jpg 1536w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/US-California-3.75-MW-7.45-MWh-2048x1536.jpg 2048w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/US-California-3.75-MW-7.45-MWh-16x12.jpg 16w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p id=\"ember100\">\ud83c\udfa5 <strong>Watch the project in action:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-9-16 wp-has-aspect-ratio\" style=\"margin-top:0;margin-right:0;margin-bottom:0;margin-left:0\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"\ud835\udfef.\ud835\udff3\ud835\udff1 \ud835\udde0\ud835\uddea \/ \ud835\udff3.\ud835\udff0\ud835\udff1 \ud835\udde0\ud835\uddea\ud835\uddf5 \ud835\uddd5\ud835\uddd8\ud835\udde6\ud835\udde6 \ud835\uddf6\ud835\uddfb \ud835\uddd6\ud835\uddee\ud835\uddf9\ud835\uddf6\ud835\uddf3\ud835\uddfc\ud835\uddff\ud835\uddfb\ud835\uddf6\ud835\uddee Continuous power is vital for high-precision manufacturing. In\" width=\"563\" height=\"1000\" src=\"https:\/\/www.youtube.com\/embed\/GGagNCYY9f0?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"ember102\">500 kW \/ 1.956 MWh System<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Application: <\/strong>Automotive Components Manufacturing<\/li>\n\n\n\n<li><strong>Use Case: <\/strong>PV+ESS integration for extreme electricity cost reduction and peak shaving.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/USA-Jacky\uff16-Edited-1024x768.jpg\" alt=\"TWS Technology 500 kW \/ 1.956 MWh Project in California\" class=\"wp-image-8801\" srcset=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/USA-Jacky\uff16-Edited-1024x768.jpg 1024w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/USA-Jacky\uff16-Edited-300x225.jpg 300w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/USA-Jacky\uff16-Edited-768x576.jpg 768w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/USA-Jacky\uff16-Edited-1536x1152.jpg 1536w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/USA-Jacky\uff16-Edited-16x12.jpg 16w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/USA-Jacky\uff16-Edited.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ember105\">Maximizing ROI with CEC Listing<\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"491\" src=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/CEC-1024x491.png\" alt=\"CEC\" class=\"wp-image-8803\" srcset=\"https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/CEC-1024x491.png 1024w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/CEC-300x144.png 300w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/CEC-768x368.png 768w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/CEC-1536x736.png 1536w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/CEC-18x9.png 18w, https:\/\/tws-bess.com\/wp-content\/uploads\/2026\/11\/CEC.png 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Screenshot of the official California Energy Commission (CEC) website directory, displaying TWS Technology&#8217;s listed products<\/figcaption><\/figure>\n\n\n\n<p id=\"ember107\">Securing financial viability is just as important as technical performance. As seen above, our products hold the <strong>California Energy Commission (CEC) listing<\/strong>. For our EPC partners, this compliance milestone unlocks seamless access to <strong>financial incentives<\/strong>, significantly improving project economics.<\/p>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ember108\">Partner with TWS Technology<\/h2>\n\n\n\n<p id=\"ember109\">Whether you are a manufacturer seeking reliable backup power, or a business aiming to optimize energy revenues and mitigate peak-valley price surges, <strong>TWS ESS<\/strong> is your bankable partner.<\/p>\n\n\n\n<p id=\"ember110\">We invite EPCs, distributors, and C&amp;I end-users to collaborate with us for secure and profitable BESS deployments.<\/p>\n\n\n\n<p id=\"ember111\"><strong>Contact our team today to streamline your next U.S. storage project.<\/strong><\/p>\n\n\n\n<p id=\"ember112\">\ud83d\udce7 <a href=\"mailto:infoess@tws.com\">infoess@tws.com<\/a> \ud83c\udf10 <a href=\"https:\/\/tws-bess.com\/it\/\">Il sito web TWS-BESS.com \u00e8 dedicato alle soluzioni per sistemi di accumulo di energia a batteria (BESS).<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>TWS Technology (TWS ESS) successfully concluded its exhibition at RE+ 2026 in Las Vegas on November 19, local time. Engaging directly with leading U.S. project developers, EPCs, and distributors, our team showcased how our advanced Energy Storage Systems (ESS) solve the power continuity and cost challenges in the North American grid. Navigating U.S. Policy Shifts [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":8799,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1,12,11],"tags":[],"class_list":["post-8798","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-media","category-events","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/posts\/8798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/comments?post=8798"}],"version-history":[{"count":4,"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/posts\/8798\/revisions"}],"predecessor-version":[{"id":8806,"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/posts\/8798\/revisions\/8806"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/media\/8799"}],"wp:attachment":[{"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/media?parent=8798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/categories?post=8798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tws-bess.com\/it\/wp-json\/wp\/v2\/tags?post=8798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}